What Is Certified Payroll and Why Do They Ask for It on a Job?

By / Por

· Published / Publicado

· Updated / Actualizado

· Estimated reading time / Lectura estimada

13 minutes
Construction payroll workspace with timesheets and calculator

General guidance only / Orientación general. Verify current requirements with the local building department / Verifica los requisitos vigentes con la autoridad local.

Disclaimer: This guide is educational and does not replace legal or payroll advice. Requirements depend on your contract, who is paying for the project and the law that applies. Confirm current instructions with the agency that hired the job or with the prime contractor. NextPermit is not affiliated with the U.S. Department of Labor.

Lee la versión en español.

Featured image is an illustration generated with AI.

Maybe you saw it in a contract or a bid, or a general contractor told you: “we need your certified payroll.” If you have never heard the term, don’t worry, it is simpler than it sounds. Here is what it is, why it is asked for and how to prepare it each week.

Quick guide

  • What it is: a weekly, project-specific payroll report, with a signed statement, that shows your workers were paid what the law requires.
  • When it is required: on federal construction contracts worth more than $2,000 (measured by the prime contract, not each subcontract) and on projects with federal assistance, depending on the law that funds them.
  • What it includes: each worker’s name, type of work, hours, hourly pay, benefits, deductions and the pay received.
  • When it is due: every week with covered work, within seven days after the regular payment date.
  • Who sends it: every contractor and subcontractor. The prime contractor makes sure the subcontractors’ reports get in.

Words you will hear

  • Davis-Bacon Act: a federal law about how much workers must be paid on construction jobs that use federal money. More on it below.
  • Prevailing wage: the minimum hourly pay, plus benefits, for a type of work on your project. The U.S. Department of Labor (DOL) sets it based on the area.
  • Prime contractor: the company that signed the contract directly with the owner or agency.
  • Subcontractor: a company hired by the prime contractor to do part of the work.
  • Wage determination: the official list of minimum pay rates for your project.
  • Fringe benefits: the benefits that are part of the required minimum, such as health insurance or retirement contributions. They can be covered with contributions to benefit plans, with cash, or with a mix of both.

First, the basics: what is the Davis-Bacon Act?

It is a federal law. It says that when the federal government pays for a construction project, or helps pay for it, the workers on that job must be paid at least the minimum the DOL sets for their type of work. That minimum is called the prevailing wage, and it takes into account the area where the project is located.

Certified payroll is how contractors prove they followed that rule.

What is certified payroll?

It is a project-specific report, prepared from your payroll records, that you turn in every week to the agency that hired the job. It lists each person who worked on the project, what kind of work they did, how many hours they worked and what they were paid. Along with the report, you hand in a signed statement saying everything is true and complete.

That signature is what makes it “certified.” It does not change how you pay your people: you keep running your regular payroll, and this report is built from it.

Regular payrollCertified payroll
What it coversYour whole companyOne specific project
Who receives itYou, your payroll provider and tax agencies, as applicableThe agency that hired the job
When it is dueAccording to your usual obligationsEvery week with covered work
Signed statementNoYes, required
What it is forPaying your employees and meeting your obligationsProving the required pay was given on that project

Why do they ask for it?

It is public money, and the government wants proof that the people building the project were paid what they should be. The agency that hires the job and the DOL review these reports to confirm that each worker received the wages and benefits the law requires.

When do they ask for it?

It is required on federal government contracts to build, alter or repair public buildings or public works that are worth more than $2,000. That comes from the Davis-Bacon Act. The amount is measured by the prime contract, not by each subcontract: if the prime contract is over $2,000, the work of the subcontractors is covered too.

Other federal laws apply the same rules to projects with “federal assistance”: grants, loans, loan guarantees or insurance, even if the one hiring you is a city, a county or another owner. In those cases, each law has its own conditions, so coverage can be broader or narrower than under Davis-Bacon. Keep in mind that federal money in a project does not always mean the rules apply. It depends on the law behind the funding and on what your contract says.

Not every project requires it. A private job with no federal money usually does not. Some states also have their own prevailing wage rules for state projects, and they differ from state to state. Check your contract and ask the agency or the prime contractor.

A practical tip: look through the bid documents and the contract for the words “Davis-Bacon,” “prevailing wage,” “wage determination” or “certified payroll.”

An example with made-up numbers

Picture a company with a painting contract at a public school. The wage determination in its contract sets these rates. They are fictional, just to show the idea:

ItemAmount
Base hourly wage$35.00
Fringe benefits per hour$25.00
Total prevailing wage$60.00 per hour
40 regular hours$2,400

That $2,400 is the minimum combined pay and benefits for that sample week, before overtime and deductions. It is not the same as the worker’s paycheck. The $25 in benefits can be covered with contributions to benefit plans, with cash, or with a mix of both. That is why the report has separate places for wages, benefits, deductions and final pay.

What goes on the report?

For each covered worker, every week, the report includes:

  • Name and an identifying number, for example the last four digits of the Social Security number.
  • Type of work (classification), meaning what the person actually did that week.
  • Hours worked, by day and by week, with regular and overtime hours kept separate.
  • Hourly pay, including benefits, whether paid as plan contributions or in cash.
  • Gross pay for the week: what was earned on this project and the total earned on all work that week.
  • Deductions taken from the pay.
  • Net pay: what the worker actually received.

Privacy: the DOL’s instructions say a worker’s full Social Security number must not be included. Use an identifier only, such as the last four digits.

If a person did more than one type of work during the week, each classification gets its own line, with the hours for each. Deductions have rules too: apart from the ones the regulation expressly allows, the DOL has to approve them in advance.

Overtime

Overtime comes from a different federal law, the Contract Work Hours and Safety Standards Act (CWHSSA), and it only applies to contracts above a certain amount:

  • Direct federal contracts subject to the FAR (the federal government’s purchasing rules): over $150,000.
  • Federally assisted construction contracts, where the government is not a direct party (for example, through grants or loans): over $100,000.

On those contracts, every hour over 40 in a workweek is paid at no less than one and one-half times the basic hourly rate. On Form WH-347 they are entered as “OT,” and hours worked on and off the site of the work count. Note that certified payroll starts at $2,000, but the overtime rule has higher thresholds.

What about fringe benefits on overtime hours? According to the DOL’s Fact Sheet #66E, fringe benefits must be paid for all hours worked, overtime hours included. Cash paid in place of contributions to a benefit plan does not carry the additional half-time premium. Check your contract to see how it is figured in your case.

The signed statement and Form WH-347

Every weekly report comes with a Statement of Compliance. In it, you certify that the payroll is accurate and complete and that each worker was paid at least the required wage, benefits included.

  • It is signed by the contractor or subcontractor, or by an agent who paid or supervised the workers’ pay that week.
  • It must include the signer’s date, phone number and email address.
  • Legally valid electronic signatures are accepted. Photocopied or scanned signatures are not.
  • It does not need a notary, but giving false information has legal consequences.

The DOL’s Form WH-347 is a ready-made template for this: page 1 is the payroll and page 2 is the statement. Using the form is optional, but sending the weekly payroll information and the signed statement is required. You can use your own format if it includes the same information. The DOL also offers an online version you can fill out.

The form also has three items that are easy to mix up:

  • Payroll No.: starts at 1 and goes up in order with each weekly report for the project.
  • Week ending date: the last day of the work week you are reporting.
  • Final payroll box: checked on the report for your last week of work on the project.

How to prepare it each week

  1. Check the hours. Confirm each employee’s hours and which project they worked on.
  2. Look up the wage determination. Confirm the classification and the rate for each kind of work.
  3. Compare it with your real payroll. Review wages, benefits, overtime and deductions.
  4. Fill out the report. Enter the project, the payroll number and the week ending date.
  5. Sign the Statement of Compliance. The authorized person confirms the information is accurate.
  6. Send it and keep a copy. Save what you sent and any corrections you make later.

Who sends it, how often and where?

  • Who: every contractor and subcontractor doing covered work. The prime contractor makes sure all of its subcontractors’ reports are submitted.
  • How often: every week in which there is covered work.
  • Deadline: according to the DOL, within seven days after the regular payment date for that payroll. For example, if you pay your crew on Fridays, you have until the following Friday.
  • Where: to the agency that hired the job. If the federal agency is not a party to the contract, it goes to whoever keeps the records (the applicant, sponsor or owner), who passes it on to the agency.
  • How: you can send it electronically if the system accepts a legally valid electronic signature. Some agencies and contractors use their own online platforms, so ask which one you should use.

How long should I keep the records?

At least three years after all the work on the prime contract is finished. Keep the payrolls, basic records and contract documents.

Mistakes to avoid

  • Skipping a week or sending it late.
  • Forgetting the signed statement, or using a scanned or photocopied signature.
  • Writing a worker’s full Social Security number on the report.
  • Listing a worker under one classification when they did different kinds of work.
  • Leaving out benefits or deductions, or mixing regular hours with overtime.
  • Not following up on your subcontractors’ reports, if you are the prime contractor.
  • Throwing out records before three years have passed.

What happens if the rules are not followed?

The federal regulation (29 CFR 5.5) lists several possible consequences:

  • The agency can withhold payments already owed, and must do so if the DOL asks in writing.
  • After written notice, it can suspend further payments, advances or guarantees.
  • Failing to submit records can be grounds for debarment, which means being barred from federal contracts.
  • Breaking the contract clauses can be grounds for terminating the contract.
  • Certifying false information can lead to civil or criminal consequences.

What happens in your case depends on the contract and the agency.

Weekly checklist

  • I confirmed my contract requires certified payroll
  • I have the wage rates (wage determination) for my contract
  • Each worker has a name, identifier (not the full Social Security number) and the correct classification
  • Regular and overtime hours, hourly pay, benefits and deductions reviewed
  • Payroll number and week ending date are correct
  • Statement of Compliance signed with a valid signature
  • Sent to the agency or prime contractor on time
  • Copy saved for at least three years

Frequently asked questions

Does every construction job need certified payroll?
No. It depends on whether the contract involves federal funds and these laws apply (or on state rules). Check your contract.

Is Form WH-347 required?
No. The form is optional, but the weekly payroll information and the signed statement are required.

Does the statement need to be notarized?
No. It does not need a notary, but it carries penalties if it contains false information.

Where do I find the prevailing wage for my project?
It should be in the contract documents as a wage determination. The DOL publishes them on SAM.gov, which is open to the public.

I am a subcontractor. Who do I give it to?
Usually the prime contractor, who takes care of submitting its subcontractors’ reports. Confirm the process in your contract.

What do I do if there was no work on the project one week?
The WH-347 instructions I reviewed do not explain this. Follow your contract and ask the agency or the prime contractor whether they want a report for that week.

What if I find a mistake after sending it?
Those instructions do not cover this either. Let the agency or the prime contractor know, ask how they want the correction submitted and keep a copy of both versions.

Official sources

U.S. federal government pages, checked November 28, 2026:

📘 Get the full guide

How to Get a Construction Permit in Florida

A step-by-step guide for homeowners, from finding the right building department and preparing documents to inspections and closing your permit. Written in plain English.

Buy it on Payhip →    Buy it on Amazon →