How to Fill Out a Construction Permit Application in Florida: A Step-by-Step Guide

By / Por

· Published / Publicado

· Updated / Actualizado

· Estimated reading time / Lectura estimada

8 minutes
Construction permit application on architectural plans / Solicitud de permiso de construcción sobre planos arquitectónicos

General guidance only / Orientación general. Verify current requirements with the local building department / Verifica los requisitos vigentes con la autoridad local.

⚠️ Disclaimer: This article is for informational and educational purposes only and does not constitute legal, professional, engineering, construction, or code-compliance advice. Permit requirements, timelines, fees, procedures, interpretations, and enforcement practices vary by jurisdiction and may change without notice. Always verify current requirements with your local building department and, when appropriate, consult a licensed contractor, architect, engineer, attorney, or other qualified professional before starting any project.

The permit application sounds official, but it’s really just the form where you tell the city: “Here’s my house, and here’s what I want to do.” That’s it. Once you know what goes where, it’s a lot less intimidating than it looks.

Here’s how to get through it without guessing.


Step 1: Make Sure You Actually Need a Permit

Before you fill out anything, confirm your project requires a permit. Since July 1, 2026, Florida law (HB 803) exempts certain single-family residential projects valued under $7,500. It is not automatic: you must request it in writing from your building department. The exemption has important exceptions, including flood hazard areas and structural, electrical, plumbing, gas and mechanical work. Read our full breakdown of HB 803 here.

Not sure where your project falls? A quick call to your local building department will tell you.

Step 2: Find Out Who Handles Your Permit

Your mailing address isn’t always your permitting address. Some homes have a city name in the address but sit on unincorporated county land, which means the county handles the permit, not the city.

The easiest way to check: search your address on your county’s Property Appraiser website and look for the field called Municipality. If it shows a city name, start with that city. If it says Unincorporated, you’ll go through the county.

Step 3: Gather Your Property Information

Most applications ask for the same basic details, and all of them are on the Property Appraiser website. It’s free, no account needed, and takes about two minutes.

You’ll want:

  • Property address
  • Owner’s name
  • Folio number, also called a parcel number
  • Building use, present use and proposed use. For most home renovations, all three are the same.
  • Legal description or subdivision name. Some counties, like Miami-Dade, often ask for it.

Keep this information handy. You’ll use it again on other forms.

Residential floor plans and construction planning tools

Step 4: Download the Right Form (and Check the Date)

Always download the application directly from your city or county website. Not from a search result, and not from a copy you saved two years ago. Cities update their forms, and using an old version is one of the most common reasons applications get rejected on the first step.

The version date is usually printed at the top or bottom of the form. If it looks old, get a fresh copy.

Every jurisdiction works a little differently. Two examples:

Broward County publishes a countywide Uniform Building Permit Application (the latest version is dated November 2025). Each city can have its own submission instructions, additional documents and portal, so confirm with your city which version and documents it requires.

Miami-Dade County handles permits for properties in unincorporated areas, while each of its 35 municipalities handles permits within its own boundaries. If your folio number starts with 30, your property is generally in unincorporated Miami-Dade and you’ll start with the county. Otherwise, confirm the exact municipality through the Property Appraiser website and use that city’s current application. If your project also needs a county review (for example, water and sewer, DERM or impact fees), the county will ask for a copy of the municipal application and its process number. So in that case, start with the city.

Step 5: Fill In the Fields

Before you write anything, read the whole form once. Look for anything that could take extra time, like a contractor’s license number, a notarized signature or an engineer’s information.

Most applications ask for the same core fields. Here’s what goes where:

FieldWhat to putExample
Job addressAddress where the work will happen123 Main Street
Folio or parcel numberFrom the Property Appraiser website. The format varies by county.Miami-Dade example: 30-XXXX-XXX-XXXX
OwnerLegal name of the property ownerJane Smith
Permit typeMain discipline of the workBuilding or Electrical
Type of workCategory of the projectAlteration
Description of workShort and specificReplace bathtub with walk-in shower
Estimated valueCost of labor and materials$8,500
ContractorCompany name and license, if applicableABC Plumbing, License #…
Present / proposed useUse before and after the projectSingle-family residential

The description doesn’t need to be a novel. The city just needs to understand what’s changing:

“Replace a bathtub with a walk-in shower”
“Replace water heater in garage”
“Add a ceiling fan where there wasn’t one”

Step 6: Identify the Owner and the Person Responsible for the Work

The application generally identifies both the property owner and the person or company responsible for performing the work. If a licensed contractor is handling the project, enter the contractor’s legal business name and license information exactly as registered.

Electrical, plumbing, mechanical, structural and fire-safety work generally requires an appropriately licensed contractor, unless the project qualifies for a valid owner-builder exemption. Florida allows owners to act as their own contractor on certain projects at a one- or two-family home they own and will use themselves, not one they plan to sell or lease. It can save money, but it also means you take on the responsibility. If you qualify as an owner-builder (the owner who pulls the permit and takes responsibility for the work), follow your building department’s disclosure and identification requirements, and confirm eligibility before listing yourself as the responsible party. See our full guide on owner-builder permits here.

Never sign a blank or incomplete application. Check whether the owner’s signature must be notarized or completed in person before building department staff.

Step 7: Prepare Any Additional Forms

Depending on your city and project, you may also need:

  • A short form confirming the estimated cost of the work
  • A signed owner statement approving the project
  • A Notice of Commencement (NOC), usually for larger or higher-value projects

In Florida, the NOC law generally requires one when the work costs more than $2,500. If it costs more than $5,000, you also give the building department proof before the first inspection: a certified copy of the recorded NOC, a notarized statement that it was filed for recording (with a copy), or the Clerk’s recording number. That second limit was $2,500 until a change in the law in 2023, which is why many local forms and checklists still show the older figure. Always check the current form and checklist for the specific building department you’re filing with, not just the general county page.

When required, the NOC is recorded with the county Clerk of Court, and a copy is posted at the job site.

If you live in an HOA community, remember that HOA approval is completely separate from the city permit.

Step 8: Attach Plans and Specifications (If Needed)

Some projects need drawings showing what’s changing and where. Specifications tell the city exactly what’s being installed, like the model of an electrical panel or the fixtures in a bathroom remodel.

Simple projects, like a water heater replacement, may accept basic drawings or need no plans at all. Structural work and other regulated projects may require plans signed and sealed by a Florida-licensed design professional.

Step 9: Submit, Pay and Let the Process Work

Once you submit and pay any fees required at intake, many jurisdictions run a quick prescreen to check whether the basic documents are present. Submit the most complete application you can. A prescreen isn’t the same as approval, and it doesn’t prevent later plan-review comments.

What Happens After You Submit

From here, your application generally moves through the same broad stages, though timing varies by jurisdiction: a completeness check or prescreen, plan review, corrections if needed, permit issuance, inspections, and final approval and closeout. Read our full breakdown of what happens after you submit.


One Call Can Answer Most of This

If this still feels like a lot, a short call to your building department clears up most of it:

“Hi, I’m a homeowner at [your address]. I want to apply for a permit to [brief description of work]. Can you tell me which form I need, how you accept applications, and whether any part of this goes through the county?”

Staff get this question every day. You don’t need to know the technical terms. Just describe what you want to do and ask.

📘 Get the full guide

How to Get a Construction Permit in Florida

The complete step-by-step guide for homeowners. It covers every stage of the process, from identifying your jurisdiction and gathering documents to navigating online portals, handling inspections and closing your permit. Written in plain English, with no contractor jargon.


Help keep NextPermit growing
Ayuda a que NextPermit siga creciendo

Support our free guides with a coffee.
Apoya nuestras guías gratuitas con un café.

Support / Apoya en Ko-fi ↗