How to Schedule and Pass Your Construction Inspections in Florida: A Step-by-Step Guide

By / Por

· Published / Publicado

· Updated / Actualizado

· Estimated reading time / Lectura estimada

11 minutes
A building inspector and homeowner review a clipboard inside a house under construction.

General guidance only / Orientación general. Verify current requirements with the local building department / Verifica los requisitos vigentes con la autoridad local.

⚠️ Disclaimer: This article is for informational and educational purposes only and does not constitute legal, professional, engineering, construction, or code-compliance advice. Permit requirements, timelines, fees, procedures, interpretations, and enforcement practices vary by jurisdiction and may change without notice. Always verify current requirements with your local building department and, when appropriate, consult a licensed contractor, architect, engineer, attorney, or other qualified professional before starting any project.

¿Prefieres leer en español? Lee la versión en español.

Once your permit is approved, you may need inspections at different stages of the project. Missing an inspection can delay your work.

Here’s what to expect, how to get ready, and what to do if an inspection doesn’t pass.

⚡ Quick guide

Do I need inspections? Yes, if your permit includes them. Ask the building department which ones apply.

Who do I contact? The city or county building department that issued your permit.

What should I prepare? The permit card, the approved plans, the NOC if required, and finished work that is still visible.

When can I move on, and how do I know I’m done? Request each inspection when that stage is ready. Do not cover the work until it is approved. You are done when the portal shows your permit as closed.


Step 1: Find Out Which Inspections You Need

Inspections happen at different stages. For example, an inspector may need to check wiring before you put up drywall. Ask which inspections your project needs before you start.

This table shows common inspections. Your project may need fewer or different ones. Ask your building department for the exact list. For a local example, see Palm Beach County’s administrative code, section 110.3 (published in a county commission agenda packet; local requirements, not a checklist for every Florida jurisdiction).

StageWhen it happens
Foundation / footingAfter excavation and forms are set, before concrete is poured
Rough-in (electrical, plumbing, mechanical)After systems are run, before they’re covered by walls
FramingAfter framing is complete and required rough-in inspections are approved, before insulation
InsulationAfter framing is approved, before drywall
FinalAfter all work required by the permit is complete; occupancy or use may require a separate certificate

You may not need every inspection in this table. Check your permit and online record. Don’t cover work that still needs to be inspected. Wait for approval before moving to the next stage.

If your work may qualify for a permit exemption under HB 803, confirm it with your building department before starting. The exemption covers eligible work valued below $7,500 on an owner’s single-family property. It excludes electrical, plumbing, structural, mechanical, and gas work, and does not apply if any part of the property is in a flood hazard area.

To request the exemption, you or your contractor must submit a written request with documents showing what the work involves and how much it is worth. Even if you do not need the permit, that does not mean every part of the project is approved or that the local government has the same duty to review exempted work. See Florida’s permit exemption law and our HB 803 guide.

Step 2: Keep Your Permit and Plans at the Job Site

Keep the permit documents accessible at the job site. If your project requires a Notice of Commencement (NOC), record it and post a copy at the site (Florida’s NOC law). When the direct contract exceeds $5,000, give the department proof of the NOC before the first inspection. You can provide a certified copy, a notarized statement that it was filed for recording together with a copy, or the information identifying the document in the clerk’s official records (Florida’s rules on proof of the NOC).

Without that proof, subsequent inspections cannot be performed or approved until you provide it. Confirm that the department received the document before requesting the visit to avoid a delay (same rules on proof of the NOC).

There is an exception for separate permits or inspections for temporary electrical or other utility service, land clearing, and other preliminary site work: these can proceed without giving the department a copy of the NOC. If you are starting with one of those tasks, ask whether the exception applies to your permit (Florida’s NOC exception for preliminary work).

Keep the approved plans accessible too. Inspectors compare the work with those documents and the applicable code. Florida law allows site plans and building permits to be kept at the worksite in their original form or as an electronic copy (Florida’s rule on keeping plans and permits at the worksite). In practice, some inspectors still expect a printed set. Keeping one at the job site is the easiest way to avoid a wasted visit. Before the visit, confirm how the inspector will access your approved plans.

Step 3: Schedule Your Inspection

Your jurisdiction is the city or county office that issued your permit and inspects your address. Florida law requires local enforcement agencies to allow inspection requests electronically, such as by email, a website form, or an app; nonelectronic requests may also be accepted at the building official’s discretion (Florida’s rules on inspection requests). Confirm the current request method for your permit and inspection type. Submitting a request does not itself confirm that the inspection has been scheduled: check the portal or obtain confirmation from the department.

Some departments require you to book by a certain time the day before. You may get an arrival window instead of an exact time. Check your department’s instructions.

Before requesting a visit, confirm:

  • The request cutoff, available dates, and the correct inspection code
  • Whether the department provides a time window, an inspector’s contact number, or another way to check the route
  • Who will provide safe access and which documents must be available

If you hold the permit as an owner-builder (the owner acting as the contractor on their own project), Florida’s exemption requires direct, onsite supervision of work not performed by licensed contractors (Florida’s owner-builder exemption). Confirm with the department who must attend the inspection and provide access. Read our owner-builder guide.

💡 Option: Use a Private Provider

Florida law lets the property owner, or the owner’s contractor with the owner’s written authorization, choose at any time to hire a private provider (a licensed professional such as a building code administrator, engineer, or architect) for plans review or required inspections instead of the city. If you use one for inspections, you must notify the building official in writing when you apply for the permit, or by 2 p.m. local time, 2 business days before the first inspection scheduled by the local building official or enforcement agency, using the commission’s adopted notice form. Separately, once work has started on a single-family or two-family home, you can switch to a private provider for a single-trade inspection by notifying the building official before the next scheduled inspection. Private provider inspections can be done in person or virtually where virtual inspection is not prohibited by applicable code, and the building official can’t prohibit them outside normal operating hours, including after hours, weekends, or holidays (Florida’s private provider law). Private providers charge their own fees, so compare the cost before you decide.

Step 4: Get Ready for the Inspector

If the work isn’t ready, you may have to book another inspection and pay another fee. Before you schedule:

  • Confirm the specific work for that stage is actually finished
  • Don’t cover or conceal anything that inspection needs to see
  • Make sure the permit card, approved plans, and any required product approvals are on site
  • Check that basic life-safety items are in place, like smoke and CO alarms, GFCI or AFCI protection, and required egress

Step 5: Know What the Inspector Will Check

The inspector checks whether the work matches your approved plans and building rules. Common problems include changes that aren’t shown on the plans, missing approvals for windows or doors, and safety items that are missing or installed incorrectly.

Not sure the work is ready? Ask your contractor before you book.

Step 6: What to Do If You Don’t Pass

If you don’t pass, don’t panic. Find out what needs to be fixed, make the corrections, and schedule another inspection.

You may have to pay a fee for another inspection. Ask your building department.

There’s also a right worth knowing: if work fails an inspection and the inspector doesn’t give you a reason based on the Florida Building Code, the Florida Fire Prevention Code, or a local ordinance within 5 business days, the building department must refund 10% of your permit and inspection fees (Florida’s rule on the 10% fee refund).

Step 7: Check When Your Permit Expires

Along with the expiration date, check how long your permit can go without an approved inspection. The Florida Building Code (section 105.4.1.3) treats an approved inspection within 180 days as active progress. You can see that provision in Palm Beach County’s administrative code (published in a county commission agenda packet) as a local example. Requesting the inspection is not enough: it needs to be approved. Confirm with the department which activity, abandonment, and extension rules apply to your permit.

For a building permit issued by a local government for a single-family dwelling, Florida’s permit expiration law specifies expiration one year after issuance or on the effective date of the next Florida Building Code edition, whichever is later, and allows the local government to extend the permit. HB 803 took effect July 1, 2026 (official bill record).

Check the status and expiration date in the portal and confirm any uncertainty with the department. The statute permits, but does not require, an expiration notice at least 30 days in advance. Request any needed extension before your deadline and keep written confirmation. If the permit has expired, ask what renewal or closeout process applies before continuing work.

Step 8: Pass the Final Inspection and Close Your Permit

The final inspection is a key step, but it isn’t always the last one. Under Florida law, a permit is closed when all of its requirements have been satisfied (Florida’s definition of a closed permit). Depending on your project, that can include other inspections, required documents, fees, and any Certificate of Occupancy or Certificate of Completion.

After your final inspection is approved, log in to your jurisdiction’s portal and confirm that every inspection shows as approved and that the permit status says closed (some systems use a different term, like “finaled”). If anything is still pending, call the building department and ask what’s missing.

Don’t skip this step even if the project feels finished. An open permit shows up in public records and can complicate or delay a future sale. Florida law does provide some special paths, like closing an expired permit when the work was substantially completed, or a building department closing a permit 6 years after issuance if it finds no apparent safety hazards, but those options require the department’s determination; they do not close your permit automatically (Florida’s rules on closing expired and older permits). See our full breakdown of what happens after you submit, including closeout, here.

Not Sure What to Do Next? Call Your Building Department

If you’re not sure which inspections you need or how to book them, call your building department. You can say:

“Hi, I have permit number [your permit number] for [brief description of work]. Can you tell me which inspections are still required, what else is needed to close the permit, and how I request an inspection?”

It’s a common question, and the department can tell you what to do next.

📘 Get the full guide

How to Get a Construction Permit in Florida

A step-by-step guide for homeowners, from finding the right building department and preparing documents to inspections and closing your permit. Written in plain English.

Buy it on Payhip →    Buy it on Amazon →

Help keep NextPermit growing
Ayuda a que NextPermit siga creciendo

Support our free guides with a coffee.
Apoya nuestras guías gratuitas con un café.

Support / Apoya en Ko-fi ↗